Portugal Windfall Tax: What the 33% Levy Means for Renewable Energy

Portugal has approved a temporary 33% levy on excess 2026 oil and refining profits, and renewables sit outside it. What the tax signals for solar, wind and battery storage, and the second order risks worth watching.
Santa Marta: What Patience Looks Like in a Solar Development Timeline

The most revealing number in a solar development is often the calendar. Santa Marta has been advancing since 2019, and its timeline shows how renewable value is actually built.
Project Baloiço: Battery Storage Development as a Sequence, Not a Single Asset

Two storage sites with identical batteries can be worth very different amounts. The difference lies in grid position, timing and the order in which milestones are cleared. How that sequence shapes Project Baloiço.
Portugal’s Energy Storage Strategy: What It Means for Santa Marta and Baloiço

Portugal’s first national energy storage strategy targets 3 GW of batteries by 2030 and 4.5 GW by 2040, backed by recurring grid capacity auctions. How the new framework affects Santa Marta and Project Baloiço.
Solar Development in Portugal: Why the Value Sits Before the Panels Go In

A finished solar farm is close to a commodity. What is scarce is everything that happens before construction. Why Solar45 focuses on early stage development in Portugal, with battery storage designed in from the start.
Santa Marta: Solar Scale and Storage Potential in Southern Portugal

Portugal’s renewable energy transition is increasingly shaped by two connected opportunities: large-scale solar generation and grid-scale battery storage.Santa Marta brings both together. Located in Southern Portugal, Santa Marta represents a major solar platform within the Solar45 pipeline. The project combines a 200MW solar opportunity with the potential integration of approximately 150MW / 600MWh of battery […]
Project Baloiço: Grid-Scale Storage and Strategic Flexibility in Portugal

As renewable generation expands across Portugal and the wider Iberian market, battery storage is becoming a central part of the next energy infrastructure cycle. Project Baloiço forms part of the Solar45 storage pipeline and reflects this shift. Structured as a 30MW / 120MWh stand-alone battery energy storage system, the project is designed around long-duration storage, […]
Low-productivity land is becoming valuable for solar in Portugal

In parts of southern Portugal, large areas of land are dry and difficult to farm productively. That is leading more landowners to consider solar as a practical use of land that otherwise generates limited economic output. As renewable targets expand, this kind of land becomes more relevant because it is often easier to allocate without […]
The Evolution of Energy Infrastructure at Scale

Solar and wind proved renewable energy works. Hybrid systems make it work better. The global energy transition has already passed its first real test. Solar and wind are no longer theoretical technologies or niche alternatives. They are proven, cost-competitive, and deployable at scale. The question now is not whether renewables work, but how energy infrastructure […]
From Planning to Full Redemption: How Early-Stage Solar Projects Create Institutional-Grade Returns

In renewable infrastructure investing, the most compelling value is often created long before construction begins. Early-stage solar projects, when managed with discipline and regulatory precision, can generate asymmetric upside while limiting capital exposure. The Santa Marta Solar Project offers a clear illustration of this approach, having achieved full redemption with a 60% total return to […]